05 / EXECUTION
15 months converts the thesis into five financing-grade proofs.
Each milestone reduces a different risk: ownership, RTL, replication, comparative performance, and customer pull.
Next: Team- 01
0–3 mo
Own the foundation
Clean IP ownership, reference interpreter, and fixed RXU specification.
- 02
3–6 mo
Prove one RXU
Single-RXU RTL with third-party synthesis at ≥100 MHz.
- 03
6–10 mo
Prove replication
4 RXU ≥3× and 8 RXU ≥5× scaling with locality and fabric counters.
- 04
10–12 mo
Prove the comparison
CPU, GPU, and graph-reduction reproduction with power and area analysis.
- 05
12–15 mo
Prove demand
Compiler demo plus a design partner committing engineering time or an LOI.